arthur39
Registered
Heck of a winter, started gathering pieces in December, Feel like I'm coming out of Hybernation Bike was turboed last year but decided to go a little higher on the boost. Had spacer plate, studs, undercut tranny, hight volume oil pump, degreed cams, hd shift shafts etc, etc, done last year. I pulled it again for some Wossner Pistons, Crower Rods, Robinson HD Output Shaft, Case Studs, New Bearings, Ape HD Valve springs, Crank balanced, counter balancer removed, Evo shift kit, and went wit a MTC multistage, Billet inner and outer, and most importantly Lee's performance windage tray . It runs great I have about 250 break in miles on it with a nice base map done by Powerhouse last year. I though I was done..... but I found someone selling a a/w plenum with heat exchanger for a price I couldn't pass up, so I really went for broke and jumped on it... any how, the a/w plenum was a lot of work as well, plumbing all the lines, modifying the radiator, up pipes etc. etc. Just got the hold downs on and the horn back on. Horn had to be modified as well to fit with the heat exchanger. I got it the way I want it, so enough out of me here are some final assembly pics.....