Tear down starts this weekend

Don Hardcastle

Busa Ridin' Sailor (ret)
Donating Member
Registered
Well,
It is time. Tear down starts this weekend. Got a hard quote from my engine builder so this weekend I am going to start the tear down process. Hopefully have it down and ready to ship by the middle of Feburary. I am planning on a complete photo-documentary of the process. Wish me luck.

BTW here is the list for engine work:

84MM GSXR1300 13:1 (1397)
WEB 70-761 GSX1300 483/536 HWD CAMSHAFTS
APE CSAKS1300 GSX1300 CAM SPROCKET KIT
APE ST1300GX 1300 CAM C.TENSIONER
CCC 43115 BUSA HI-OUTPUT OIL PUMP GEAR
SCH BRO BUSA/PR. BUSA PAIR SHIFT SHAFT
APE CS1300STN HAYABUSA CYLINDER STUDS
APE CHN10125-10 CYLINDER HEAD NUTS
CCC 4150-BUSA GSX1300R UNDERCUT TRANS
APE VS1300GSX HAYABUSA V.SPRINGS ST
SUZ 12229-24F00-0B0 BLACK 1300 M.BEARING
SUZ 12164-46E01-0B0 ROD BEARING-BLACK
COMP. VALVE JOB
STAGE 1 PORTING

After Steve (Smithers) gets it tuned, I am expecting ~195whp.


Don
 
Got a cost estimate? Sounds like a fun project!
thumb_up.gif
 
i would bet on more than that.....210+rwhp those are crazy cams. im assumeing its just going to be track bike?
 
i would bet on more than that.....210+rwhp those are crazy cams. im assumeing its just going to be track bike?
Nope,
This is going to be my daily ride. My 2nd gear is messed up. When I explained to my wife what repairing the tranny involved, she asked if there was anything else I wanted to do while we had the engine out. YAHOO!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!


Don
 
damn must be nice I was lucky to get the ok to fix 2nd gear. LOL good luck with the build and I look fwd to updates.
 
Back
Top