2 projects. The Busa needs an oil change, tires, R1 throttle tube install, new grips, front brake lever brakelight switch replace, and I still have those +1" links I've never put on.
Other project, the dirt bike. Due to the storm last week our local OHV use area is closed for a couple of months for downed/hanging tree removal. So.. new brake pads/fluid, carb re-jetting/tuning, new MX style rear fender, re-spring and new oil for the forks, and swingarm/linkage bearing re-grease. Probably some more stuff I havn't thought of yet.
Have all parts for both projects, just haven't put 'em on yet.