Go Back   Hayabusa.oRg > Technical > Maintenance and Do-It-Yourself


Reply
 
LinkBack Thread Tools Display Modes
  #41 (permalink)  
Old 02-08-2007, 12:08 AM
pward76's Avatar

 
Join Date: May 2004
Location: Iowa
Group: Donating Member
Posts: 1,189
Default

There ain't no reason we couldn't get enough members to each kick in for, say 5 shims each to make a full set to get 'er going. I'm down for that...
Reply With Quote
  #42 (permalink)  
Old 02-09-2007, 06:15 PM
I Love my Wife!

 
Join Date: Mar 2005
Location: Port Saint Lucie, FL
Group: Donating Member
Posts: 3,691
Default

I'm still on this folks....and it sounds like the more voices we get here the more refined the plan will be...and i agree...we don't need to waste dough on the redicilously high and low zone sizes...as what we need are an abundance of the "In-The Zone" sizes...as while certainly not common place?....another extreme possibility could be that someones valve train requires an abundance of (1) or (2) partcular sizes....we'll firm things up this weekend...sorry for losing track...had a busy week and?...L8R, Bill.

______________________________________
"I'm Imprisoned By My Addiction To Speed...But I do Recieve Kanjical Visits On A Daily Basis."
Reply With Quote
  #43 (permalink)  
Old 02-10-2007, 02:00 AM
elmostro's Avatar

 
Join Date: Sep 2004
Location: Jax, FL
Group: Donating Member
Posts: 387
Default

I'm in.... how much? $$$$$
Reply With Quote
  #44 (permalink)  
Old 02-11-2007, 12:00 PM
I Love my Wife!

 
Join Date: Mar 2005
Location: Port Saint Lucie, FL
Group: Donating Member
Posts: 3,691
Default

First i want to apologize to everyone for sorta dropping the ball on this issue this past week as i've been swamped with work and family issues...

2ndly?...i want to thank jjmetheny for his valuable input on suggesting that we concentrate that we concentrate the stocking of our shim banks inventory in the primary size ranges...which we shall do.

3rdly?...I'd like to thank professor for stickying this posting.

Now...here's what i'd like to do...I like jjmethenys find of...

"I have seen the factory shim kit 12800-41810 for around $370 which comes with 105 shims, 5 each of (2.50-3.50), about $3.5 per shim."

as i believe that "that" would make a great "BASE BANK" to start out with...and for bonus points?...

a. They're extremely reasonable price wise....making the most of our purchase power and...

b. THEY ARE SUZUKI O.E.M. Shims...and after re-thinking things here (based on input/responses) i'd like to keep our shim bank limited to Suzuki Certified O.E.M. Shims...no aftermarket shid...not even SUDCO...i'll be happy to retain the title of "Purist" on this matter.

However....i would like to extend that range down just a couple notches to include a few "Just-In-Case" sizes of 2.3, 2.35, 2.4 and 2.45mm shims to complete our bank so that it is "All Inclusive" for any "Working Range" shims that may be needed by others....unless anyone disagrees and feels as though they are un-necessary as well...for any GOOD reason.

Other than that?...I'm still working on the "SHIM-BANK RULES" concering a system for "Replacement Obligations" (so that if a member finds they need an extrodinary amount of a certain size shim and have all but exhausted that particular size that they be replaced upon forwarding the bank to the next member on the waiting list)

I'm also thinking that a good rule would be that a member can not "Hold The Kit" for a period of more than 1 week...as 7 days should be more than enough time to get this done and this way the bank is gaurenteed to aid at least 52 members a year...and far more if we're smart about it and have get together "Shim Partys".

So?...that's where i'm at with this and with everyones blessing?..i guess it would be okay to begin collecting funds to order up this stock "Base Shim Bank"

and one other thing i was thinking...should we try to collect enough to purchase a torque wrench (as i know not everyone owns one) and any other "Special Tools" that may be required to complete a full valve adjust job?...all thoughts and suggestions are welcome and L8R, Bill.

______________________________________
"I'm Imprisoned By My Addiction To Speed...But I do Recieve Kanjical Visits On A Daily Basis."
Reply With Quote
  #45 (permalink)  
Old 02-12-2007, 07:28 PM
Professional Pilot
 
Join Date: Dec 2002
Location: conn
Group: Members
Posts: 949
Default

had mine checked at 15 and 25k on my first busa all in spec. 99% of you guys might be wasting your time!!just did this bike at 17k ..in spec.does anyone know (besides stickly drag bikes) of anyone ever finding any adjustment needed?

______________________________________
stay off the rear brake!!
Reply With Quote
  #46 (permalink)  
Old 02-12-2007, 09:47 PM
Wag's Avatar
Wag Wag is offline
Evil Demon Busa Rider

 
Join Date: Aug 2004
Location: Rio Rancho, NM
Group: Donating Member
Posts: 9,494
Default

I'm due for a check here shortly. I suspect only two of my shims are going to need replacing but won't know until I do it.

And yes, I'm in favor of a shim bank.

--Wag--

______________________________________
"Morality is doing what is right no matter what you are told. Religion is doing what you are told no matter what is right. " -- Unknown
Reply With Quote
  #47 (permalink)  
Old 02-13-2007, 04:59 AM
bitabur's Avatar
Seasoned Pilot
 
Join Date: Jul 2005
Location: Woodinville, WA
Group: Members
Posts: 371
Default

<div>
(JINKSTER @ Feb. 04 2007,09:56)</div><div id="QUOTEHEAD">QUOTE</div><div id="QUOTE"><div>
(bigoltool @ Feb. 04 2007,05:58)</div><div id="QUOTEHEAD">QUOTE</div><div id="QUOTE">Sounds like a damn good plan Bill! Unfortunately I haven't had mine long enough to collect any shims as yet. One possible detriment to this plan may be that a lot of folks are just plain not willing to attempt to adjust em themselves! Though they would still get their old shims back from the dealer!</div>
big...it shouldn't be too daunting for the novice home mech to perform this task...per the shop manual page 2-8 in the "Periodic Maint." section outlines the procedure quite nicely...with the most scarey part being "Cam Removal" (should you need to swap out some shims) which isn't really all that scary at all and is covered in section 3-28...15 minutes of reading and your average DIY type will feel nearly confident and competent...and after post an in depth pictorial tutoring on the subject?...it should be "Just Follow Thew Step-By-Step Instruction/Pictures" childs play.

and outside of a good ratchet set?...the only non-typical special tools we may need will be a torque wrench and a magnet.

L8R, Bill. </div>
You should never use a magnet to lift out valve shims. *It can polarize the metal in the shim, making it magnetic, which in turn attracts any small bits of metal (say suspended in your engine oil) to stick to them and wear them.
Reply With Quote
  #48 (permalink)  
Old 02-15-2007, 09:16 AM
jch364's Avatar

 
Join Date: Mar 2006
Location: Dayton Ohio..yes it sucks here
Group: Donating Member
Posts: 964
Default

getting a little worried here. i got 11k miles on mine and according to the manual i need a check or something on the valves at 15k. I had asked my dealer about it and they said it would cost about $150. Am I confusing 2 different things?

______________________________________
06 busa red/black,alien head,pc3 brock map
genmar risers,tobin seat
chrome grill screens
polished brake bar
chrome dog collar spikes
Reply With Quote
  #49 (permalink)  
Old 02-15-2007, 10:00 AM
omslaw's Avatar
Impatiently Waiting...


Iceberg Champion
 
Join Date: Jun 2005
Location: Gardner, KS
Group: Administrators
Posts: 11,301
Default

<div>
(jch364 @ Feb. 15 2007,08:16)</div><div id="QUOTEHEAD">QUOTE</div><div id="QUOTE">getting a little worried here. i got 11k miles on mine and according to the manual i need a check or something on the valves at 15k. I had asked my dealer about it and they said it would cost about $150. Am I confusing 2 different things?</div>
at 15K, the manual recommends checking the valve [tappet] clearances. This job requires pulling the throttle bodies and the valve cover to measure the clearance between a cam lobe and its associated valve tappet.

Most bikes are probably within specifications and everything is buttoned up and you are on your way. $150 for this job is probably fair.

Now, if any of the clearances are out of specification, the cams must be removed and then the out of spec tappet must be pulled out. Underneath the tappet is a little shim that will be replaced to bring the clearance within spec. After the adjustment(s) have been made, the cams reinstalled and torqued down, the clearances should be measured again to verify everything is still in spec.

As you can imagine, having to replace a shim will add significantly to the cost. If you're mechanically-inclined, checking the clearances and/or replacing shims is not hard...it's more time-consuming than anything.

Those of us who regularly do this task would benefit by having the 'bank'...in case a shim is needed, it could be readily available.


HTH...

--Omar

______________________________________
'04 Blue/Silver
Reply With Quote
  #50 (permalink)  
Old 02-15-2007, 10:29 AM
jjmetheny's Avatar
Professional Pilot
 
Join Date: Jul 2004
Location: Des Moines, IA
Group: Members
Posts: 717
Default

Just for fun this is from the service manual on how to check and adjust your valve clearance.










______________________________________
2000 blue/silver MCX intercooled full exhaust...sleeper
Reply With Quote
  #51 (permalink)  
Old 02-15-2007, 11:08 AM
jch364's Avatar

 
Join Date: Mar 2006
Location: Dayton Ohio..yes it sucks here
Group: Donating Member
Posts: 964
Default

you know this is why i love this board and appreciate the people in it. I have no idea what the heck that stuff is above but i appreciate the info. I have learned so much since being a member. not to mention the money i have saved. I owe alot of you folks a round of burgers at the bash this year!

______________________________________
06 busa red/black,alien head,pc3 brock map
genmar risers,tobin seat
chrome grill screens
polished brake bar
chrome dog collar spikes
Reply With Quote
  #52 (permalink)  
Old 02-16-2007, 10:43 PM
LiBusa's Avatar
New Recruit
 
Join Date: Jul 2005
Location: Philadelphia, PA
Group: Members
Posts: 87
Default

I'd be interested. How can I be included. I live in Philly and I think getting together for a Busa Valve Fest is a good idea. I have 14K on my bike and I believe the valves need to be checked at 15K. Dealer quoted $275 for inspection and 350 for adjustment.

~lionel
Reply With Quote
  #53 (permalink)  
Old 02-17-2007, 01:18 PM
heavybusa's Avatar
Just another guy

 
Join Date: Apr 2006
Location: Va
Group: Donating Member
Posts: 18,011
Default

BumP

______________________________________
Greg
"Obstacles are those frightful things you can see when you take your eyes off your goal." - Henry Ford
Reply With Quote
  #54 (permalink)  
Old 02-17-2007, 03:59 PM
jjmetheny's Avatar
Professional Pilot
 
Join Date: Jul 2004
Location: Des Moines, IA
Group: Members
Posts: 717
Default

<div>
(heavybusa @ Feb. 17 2007,12:18)</div><div id="QUOTEHEAD">QUOTE</div><div id="QUOTE">BumP</div>
Uh, it's stickied to the top . No wonder you have so many post




______________________________________
2000 blue/silver MCX intercooled full exhaust...sleeper
Reply With Quote
  #55 (permalink)  
Old 02-17-2007, 04:35 PM
GIXERHP's Avatar
THERES NO REPLACEMENT FOR DISPLACEMENT


 
Join Date: Jan 2003
Location: NASHUA NH
Group: Donating Member
Posts: 7,153
Default

I have spoken with Jinkster, and have offered my own personal kit! Jinkster is working on the details, info will be posted later!
Thanks John

______________________________________
04 LIMITED BUSA, 1397 kit, intake cam swap, 50hp wet NOS kit!
92 GSXR 1100/1216 THE BABY I JUST CANT GIVE UP
99 BUSA, SOON TO SEE THE ROAD AGAIN
Reply With Quote
  #56 (permalink)  
Old 03-01-2007, 01:09 AM
omslaw's Avatar
Impatiently Waiting...


Iceberg Champion
 
Join Date: Jun 2005
Location: Gardner, KS
Group: Administrators
Posts: 11,301
Default

Looks like I'm gonna need at least 4 shims.

Are we close/ready to start using the 'bank'?

______________________________________
'04 Blue/Silver
Reply With Quote
  #57 (permalink)  
Old 03-01-2007, 06:54 AM
GIXERHP's Avatar
THERES NO REPLACEMENT FOR DISPLACEMENT


 
Join Date: Jan 2003
Location: NASHUA NH
Group: Donating Member
Posts: 7,153
Default

<div>
(omslaw @ Feb. 28 2007,22:09)</div><div id="QUOTEHEAD">QUOTE</div><div id="QUOTE">Looks like I'm gonna need at least 4 shims.

Are we close/ready to start using the 'bank'?</div>
Its been shippes to Jinkster, Pm him and he'll put you on the list!

______________________________________
04 LIMITED BUSA, 1397 kit, intake cam swap, 50hp wet NOS kit!
92 GSXR 1100/1216 THE BABY I JUST CANT GIVE UP
99 BUSA, SOON TO SEE THE ROAD AGAIN
Reply With Quote
  #58 (permalink)  
Old 03-01-2007, 10:37 PM
I Love my Wife!

 
Join Date: Mar 2005
Location: Port Saint Lucie, FL
Group: Donating Member
Posts: 3,691
Default

well folks......I have good news and bad news...

The Good News: I recieved the shim kit from GIXERHP today at my work address and it'a all it's pictured to be...plenty of shims of all sizes....

The Bad News?: I have just one day off between now and the time I'm scheduled to leave town riding O-Ren up to Daytona's Bike Week...and that one day off is about just time to change O-Rens oil & filter, giver a good detailing and load'er up...but definantly not enough time to do a proper valve adjust let alone do any justice to an accompanying step-by-step pictorial/tutorial posting on the topic...besides...i'd be my luck that i'd get all rushed and do sumpt'in stupid like drop a shim down in my crankcase or any other numerous "Murphys Law" scenarios and wind up blowing my planned trip to daytonas bike week over it...so the prudent thing?...I hafta ask the patience of the collective here folks...I wanna do this thing right and not under the gun of father time..so it looks like i ain't gonna even dream of doing this until post bike week...hope i ain't pi$$'in anyone off here but my heart and mind know it's the right thing to do...as anything worth while is worth taking the time to do it right...and?...do it justice...cool?

And huge thanks to GIXERHP for providing us the kick-off kit.

L8R, Bill.

______________________________________
"I'm Imprisoned By My Addiction To Speed...But I do Recieve Kanjical Visits On A Daily Basis."
Reply With Quote
  #59 (permalink)  
Old 03-01-2007, 11:08 PM
Wag's Avatar
Wag Wag is offline
Evil Demon Busa Rider

 
Join Date: Aug 2004
Location: Rio Rancho, NM
Group: Donating Member
Posts: 9,494
Default

Fortunately, when I checked mine the other day, they were/are all within tolerances. Awesome!

Thanks for putting this together, though, guys. Next time I check mine, I'll take some photos too.

--Wag--

______________________________________
"Morality is doing what is right no matter what you are told. Religion is doing what you are told no matter what is right. " -- Unknown
Reply With Quote
  #60 (permalink)  
Old 03-26-2007, 11:32 AM
Burger King's Avatar
breakin' the law

 
Join Date: Dec 2005
Location: Coastal Empire
Group: Donating Member
Posts: 624
Default

I sent Jinkster a PM but never received a response.
Is this still happening? I really need to check mine and would like to have the kit before I do.

______________________________________
The Kings pain is your gain

"Far better is it to dare mighty things, to win glorious triumphs, even though checkered by failure, than to take rank with those poor spirits who neither enjoy much nor suffer much, because they live in the gray twilight that knows not victory nor defeat"

Teddy R.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 07:29 AM.


(c) 1999-2009 Hayabusa Owners Group